Tough Places, Tough Tools

Out on the jobsite, concrete finishers stand ready to shape wet ready-mix into a new stretch of highway. Mixer trucks are lined up at the concrete batch plant, waiting to take on their loads. But hold on—an electrical problem has shut down the plant. It’s time to call Keithly Electric.

Read More (PDF)


I’ll leave the meter running!

"If the problem had not been discovered and fixed," Bryson said, "the company would have run the risk of an arc flash event" —an electrical breakdown of the resistance of air which can occur when a path opens up between a high voltage line and a lower voltage or ground.  

Read More (PDF)


What it takes to design custom control panels 

"We’ll take their existing design and say, 'Have you guys thought about this?' This is good time to develop criteria for future expansion, maintenance, power availability..."

Read More (PDF)